🇵🇱 CHEBA PL
Environment
CHEBA is a laboratory accredited by PCA under number AB 843 (Warszawa, Poland). Its accreditation scope covers 38 test methods in the following areas: Environment. Test objects include: Workplace environment - non-laser optical radiation, Workplace environment - air, Radiation sources or machines, General environment – noise from installations, equipment and indus…. Most frequently used techniques: Direct measurement method, Gravimetric method, Direct measurement method (method A).
At a glance
- Accreditation number: PCA AB 843
- Methods in scope: 38
- Types of test objects: 11
- Techniques used: 9
- City: Warszawa, Poland
- Accreditation number
- AB 843
- Accreditation body
- PCA
- Address
- Laboratorium Inżynierii Środowiska., Badania Środowiska Pracy Sp. z o.o., ul. Wał Miedzeszyński 184,, 04-987 Warszawa
- City
- Warszawa, Poland
What this laboratory tests (11)
- Workplace environment - non-laser optical radiation — 12 methods
- Workplace environment - air — 6 methods
- Radiation sources or machines — 4 methods
- General environment – noise from installations, equipment and industrial plants — 2 methods
- Workplace environment - cold microclimate — 2 methods
- Workplace environment - hand-arm vibration — 2 methods
- Workplace environment - hot microclimate — 2 methods
- Workplace environment - moderate microclimate — 2 methods
- Workplace environment - noise — 2 methods
- Workplace environment - ultrasonic noise — 2 methods
- Workplace environment - whole-body vibration — 2 methods
Analytical techniques used (9)
- Direct measurement method — 10 methods
- Gravimetric method — 2 methods
- Direct measurement method (method A) — 1 method
- Direct measurement method (method M) — 1 method
- Direct measurement method (method O) — 1 method
- Direct measurement method (method X) — 1 method
- Electrochemical method — 1 method
- Personal dosimetry method — 1 method
- Personal dosimetry method; Stationary method — 1 method
Accreditation scope — test methods (38)
| No. | Test object | Methodology / Parameters | Technique | Reference document | |
|---|---|---|---|---|---|
| Test methods | |||||
| 1 | Workplace environment - air | Air sampling for the assessment of occupational exposure to: dust agents inhalable fraction respirable fraction metals and their compounds, including inhalable fraction respirable fraction |
Personal dosimetry method | PN-Z-04008-7:2002 | PN-Z-04008-7:2002+ Az1:2004 | |
| 2 | Workplace environment - air | Air sampling for the assessment of occupational exposure to: organic substances, including inhalable fraction inorganic substances, including inhalable fraction respirable fraction thoracic fraction |
Personal dosimetry method; Stationary method | PN-Z-04008-7:2002 | PN-Z-04008-7:2002+ Az1:2004 | |
| 3 | Workplace environment - air | Exposure index (calculated) | PN-Z-04008-7:2002 | PN-Z-04008-7:2002+ Az1:2004 | ||
| 4 | Workplace environment - air | Gas concentrations CO (3,48 - 232) mg/m3 Range (3-200) ppm NO (0,37 - 6,20) mg/m3 (0,3-5,0) ppm NO2 (0,19 - 2,86) mg/m3 (0,10-1,50) ppm |
Electrochemical method | PB-07 wydanie 3 z dnia 02.04.2018 r. | |
| 5 | Workplace environment - air | Concentration of harmful dust agents – inhalable fraction : Apatites and phosphorites Portland cement Titanium dioxide Graphite: a) natural graphite b) synthetic graphite Kaolin Amorphous and synthetic silica: Wood dusts Flour dusts Dusts not classified according to toxicity Organic dusts of animal and plant origin, excluding wood and flour dusts Carbon black Calcium sulfate (VI) (gypsum) Talc Coal (hard, brown) Magnesium, calcium carbonate (dolomite) Silicon carbide, non-fibrous Range (0,09 – 20,0) mg/m3 |
Gravimetric method | PN-Z-04507:2022-05 | PN-Z-04507:2022-05/Ap1:2022-08 | |
| 6 | Workplace environment - air | Concentration of harmful dust agents – respirable fraction: Apatites and phosphorites Portland cement Natural graphite Amorphous and synthetic silica: Organic dusts of animal and plant origin, excluding wood and flour dusts Talc Coal (hard, brown) Range (0,08 – 6,3) mg/m3 |
Gravimetric method | PN-Z-04508:2022-05 | PN-Z-04508:2022-05/Ap1:2022-08 | |
| 7 | Workplace environment - noise | A-weighted equivalent sound level Maximum A-weighted sound level Range (35 – 135) dB C-weighted peak sound pressure level Range (35 – 138) dB |
Direct measurement method | PN-N-01307:1994 | PN-EN ISO 9612:2011 z wyłączeniem metody obejmującej Strategię 2 i Strategię 3 – punkt 10 i 11 | |
| 8 | Workplace environment - noise | Noise exposure level referred to 8-hour Daily working time the average weekly working time (calculated) |
PN-N-01307:1994 | PN-EN ISO 9612:2011 z wyłączeniem metody obejmującej Strategię 2 i Strategię 3 – punkt 10 i 11 | ||
| 9 | Workplace environment - ultrasonic noise | Equivalent sound pressure level in one-third octave bands with centre frequencies (10 – 40) kHz. Maximum sound pressure level in one-third octave bands with centre frequencies (10 – 40) kHz Range (37 – 159) dB |
Direct measurement method | PN-Z-01339:2020-12 | |
| 10 | Workplace environment - ultrasonic noise | Equivalent sound pressure level in one-third octave bands with centre frequencies (10 – 40) kHz referred to: 8-hour Daily working time; the working week (calculated) |
PN-Z-01339:2020-12 | ||
| 11 | General environment – noise from installations, equipment and industrial plants | A-weighted equivalent sound pressure level Range (25,0 – 136,0) dB |
Direct measurement method | Załącznik Nr 7 do Rozporządzenia Ministra Klimatu i Środowiska z dnia 07.09.2021 r. (tj. Dz.U. 2023, poz. 1706) z wyłączeniem punktu E.II.1 i F | |
| 12 | General environment – noise from installations, equipment and industrial plants | A-weighted equivalent sound pressure level for the reference time T expressed by the indicators LAeqD and LAeqN (calculated) | Załącznik Nr 7 do Rozporządzenia Ministra Klimatu i Środowiska z dnia 07.09.2021 r. (tj. Dz.U. 2023, poz. 1706) z wyłączeniem punktu E.II.1 i F | ||
| 13 | Workplace environment - hand-arm vibration | Frequency-weighted r.m.s. vibration acceleration Range (0,6 - 316,0) m/s2 |
Direct measurement method | PN-EN-ISO 5349-1:2004 | PN-EN-ISO 5349-2:2004 | PN-EN-ISO 5349-2:2004/A1:2015-11 | |
| 14 | Workplace environment - hand-arm vibration | Daily exposure, expressed as the energy-equivalent value for 8 hours of action of the vector sum of the r.m.s. frequency-corrected vibration accelerations determined for three directional components (ahwx, ahwy, ahwz), Exposure lasting 30 minutes or less, expressed as the vector sum of the r.m.s. frequency-weighted vibration accelerations determined for three directional components (ahwx, ahwy, ahwz) (calculated) | PN-EN-ISO 5349-1:2004 | PN-EN-ISO 5349-2:2004 | PN-EN-ISO 5349-2:2004/A1:2015-11 | ||
| 15 | Workplace environment - whole-body vibration | Frequency-weighted r.m.s. vibration acceleration Range (0,04 - 17,6) m/s2 |
Direct measurement method | PN-EN 14253+A1:2011 | |
| 16 | Workplace environment - whole-body vibration | Daily exposure, expressed as the energy-equivalent value for 8 hours of action of the r.m.s. frequency-corrected vibration acceleration dominant among the vibration accelerations determined for three directional components taking into account the appropriate factors (1.4awx, 1.4awy, awz), Exposure lasting 30 minutes or less, expressed as the r.m.s. frequency-weighted vibration acceleration dominant among the vibration accelerations determined for three directional components taking into account the appropriate factors (1.4awx, 1.4awy, awz) (calculated) | PN-EN 14253+A1:2011 | ||
| 17 | Workplace environment - moderate microclimate | Air temperature Range (10 – 30) oC Black globe temperature Range (10 - 40) oC Air humidity Range (20- 90) % Air velocity Range (0,15 -1,0) m/s |
Direct measurement method | PN-EN ISO 7730:2006+Ap2:2016-04 | |
| 18 | Workplace environment - moderate microclimate | PMV index, PPD index (calculated) | PN-EN ISO 7730:2006+Ap2:2016-04 | ||
| 19 | Workplace environment - hot microclimate | Air temperature Range (15 - 50) oC Natural wet bulb temperature Range (15 - 40) oC Black globe temperature Range (20 - 60) oC |
Direct measurement method | PN-EN 7243:2018-01 | |
| 20 | Workplace environment - hot microclimate | WBGT index, WBGT eff index (calculated) | PN-EN 7243:2018-01 | ||
| 21 | Workplace environment - cold microclimate | Air temperature Range (-30 - 10) oC Black globe temperature Range: (-30 - 10) oC Air humidity Range (20-90) % Air velocity Range (0,4 - 5,0) m/s |
Direct measurement method | PN-EN ISO 11079:2008 | |
| 22 | Workplace environment - cold microclimate | IREQmin index, IREQneutral index, twc index (calculated) | PN-EN ISO 11079:2008 | ||
| 23 | Workplace environment - non-laser optical radiation | Effective irradiance for UV in the spectral range 180 – 400 nm Range (10-6 – 39,9) W/m2 |
Direct measurement method (method A) | PN-EN 14255-1:2010 | |
| 24 | Workplace environment - non-laser optical radiation | Effective irradiation with hazardous ultraviolet in the spectral range 180 – 400 nm (calculated) | PN-EN 14255-1:2010 | ||
| 25 | Workplace environment - non-laser optical radiation | Irradiance of UVA radiation in the spectral range 315 – 400 nm Range (10-3 – 3990) W/m2 |
Direct measurement method (method M) | PN-EN 14255-1:2010 | |
| 26 | Workplace environment - non-laser optical radiation | Radiant exposure to, UVA radiation in the spectral range 315 – 400 nm (calculated) | PN-EN 14255-1:2010 | ||
| 27 | Workplace environment - non-laser optical radiation | Effective irradiance VIS in the spectral range 300 – 700 nm Range (10-6 – 399) W/m2 |
Direct measurement method (method O) | PN-EN 14255-2:2010 | |
| 28 | Workplace environment - non-laser optical radiation | Effective radiance, VIS in the spectral range 300 – 700 nm (calculated) | PN-T-05687:2002 pkt. 2.5.5 | ||
| 29 | Workplace environment - non-laser optical radiation | Irradiance of VIS, IRA, IRB in the spectral range 380 – 3000 nm Range (30 – 3999) W/m2 |
Direct measurement method (method X) | PN-EN 14255-2:2010 | |
| 30 | Workplace environment - non-laser optical radiation | Radiant exposure of VIS, IRA, IRB in the spectral range (380 - 3000) nm (calculated) | PN-EN 14255-2:2010 | ||
| 31 | Workplace environment - non-laser optical radiation | Effective irradiance VIS, IRA in the spectral range 380 – 1400 nm Range (10-6 – 39900) W/m2 |
Direct measurement method | PN-T-05687:2002 pkt. 2.5.4 | PN-T-05687:2002 pkt. 2.5.5 | |
| 32 | Workplace environment - non-laser optical radiation | Effective radiance, VIS, IRA in the spectral range 380 – 1400 nm (calculated) | PN-T-05687:2002 pkt. 2.5.4 | PN-T-05687:2002 pkt. 2.5.5 | ||
| 33 | Workplace environment - non-laser optical radiation | Effective irradiance IRA in the spectral range 780 – 1400 nm Range (10-3 – 3990) W/m2 |
Direct measurement method | PN-T-05687:2002 pkt. 2.5.4 | PN-T-05687:2002 pkt. 2.5.5 | |
| 34 | Workplace environment - non-laser optical radiation | Effective radiance, IRA in the spectral range 780 – 1400 nm (calculated) | PN-T-05687:2002 pkt. 2.5.4 | PN-T-05687:2002 pkt. 2.5.5 | ||
| 35 | Radiation sources or machines | Effective irradiance UV Spectral range 180 – 400 nm Measuring range (10-6 – 39,9) W/m2 |
PN-EN 12198-1+A1:2010 | PN-EN 12198-2+A1:2010 | ||
| 36 | Radiation sources or machines | Effective irradiance VIS Spectral range 300 – 700 nm Measuring range (10-6 – 399) W/m2 |
PN-EN 12198-1+A1:2010 | PN-EN 12198-2+A1:2010 | ||
| 37 | Radiation sources or machines | Effective radiance VIS Spectral range 300 – 700 nm (calculated) |
PN-EN 12198-1+A1:2010 | PN-EN 12198-2+A1:2010 | ||
| 38 | Radiation sources or machines | Irradiance of IRA, IRB Spectral range 780 – 3000 nm Measuring range (30 – 3999) W/m2 |
PN-EN 12198-1+A1:2010 | PN-EN 12198-2+A1:2010 | ||
Reference standards (24)
PB-07 wydanie 3 z dnia 02.04.2018 r.
PN-EN 12198-1+A1:2010
PN-EN 12198-2+A1:2010
PN-EN 14253+A1:2011
PN-EN 14255-1:2010
PN-EN 14255-2:2010
PN-EN 7243:2018-01
PN-EN ISO 11079:2008
PN-EN ISO 7730:2006+Ap2:2016-04
PN-EN ISO 9612:2011 z wyłączeniem metody obejmującej Strategię 2 i Strategię 3 – punkt 10 i 11
PN-EN-ISO 5349-1:2004
PN-EN-ISO 5349-2:2004
PN-EN-ISO 5349-2:2004/A1:2015-11
PN-N-01307:1994
PN-T-05687:2002 pkt. 2.5.4
PN-T-05687:2002 pkt. 2.5.5
PN-Z-01339:2020-12
PN-Z-04008-7:2002
PN-Z-04008-7:2002+ Az1:2004
PN-Z-04507:2022-05
PN-Z-04507:2022-05/Ap1:2022-08
PN-Z-04508:2022-05
PN-Z-04508:2022-05/Ap1:2022-08
Załącznik Nr 7 do Rozporządzenia Ministra Klimatu i Środowiska z dnia 07.09.2021 r. (tj. Dz.U. 2023, poz. 1706) z wyłączeniem punktu E.II.1 i F