🇵🇱 SIGNAL CERT Sp. z o.o. PL

PCA AB 516 • Warszawa, Poland • 17 methods

AutomotiveElectronics & EMCConstruction

SIGNAL CERT Sp. z o.o. is a laboratory accredited by PCA under number AB 516 (Warszawa, Poland). Its accreditation scope covers 17 test methods in the following areas: Automotive, Electronics & EMC, Construction. Test objects include: Electrical and mechanical equipment and subassemblies with maximum…, Railway traffic control (srk) equipment of the conventional and hig…, Low-voltage electrical and electronic equipment up to 10 kV, Electrical and electronic equipment. Most frequently used techniques: Method: Nb test.

At a glance

  • Accreditation number: PCA AB 516
  • Methods in scope: 17
  • Types of test objects: 6
  • Techniques used: 1
  • City: Warszawa, Poland
Accreditation number
AB 516
Accreditation body
PCA
Address
ul. Senatorska 2, 00-075 Warszawa, LABORATORIUM BADAWCZE URZĄDZEŃ I SYSTEMÓW STEROWANIA, TRANSPORTU SZYNOWEGO, ul. Modelarska 12
City
Warszawa, Poland

What this laboratory tests (6)

Analytical techniques used (1)

Laboratory locations

Certificate information

Issue date
06.07.2026
Issue no.
23

Accreditation scope — test methods (17)

No. Test object Methodology / Parameters Technique Reference document
Laboratorium Badawcze Urządzeń i Systemów Sterowania Transportu Szynowego
1 Electrical and electronic equipment Electrical resistance of insulation
Range do 20,00 GΩ Napięcia probiercze 500 V DC i 1000 V DC
PN-EN 61180:2016-12 | Procedura LB-1.01 wersja 3.00 z 22.07.2021 r.
2 Electrical and electronic equipment Puncture resistance
Range (500 – 5000) V AC, 50 Hz Range (500 – 6000) V DC
PN-EN 61180:2016-12 | Procedura LB-1.01 wersja 3.00 z 22.07.2021 r.
3 Low-voltage electrical and electronic equipment up to 10 kV Kompatybilność elektromagnetyczna - odporność na wyładowania elektrostatyczne
in the range do 15 kV
PN-EN 61000-4-2:2026-03
4 Low-voltage electrical and electronic equipment up to 10 kV Kompatybilność elektromagnetyczna - odporność na serie szybkich elektrycznych stanów przejściowych typu burst 5/50 ns
in the range (0,5 – 4) kV
PN-EN 61000-4-4:2013-05
5 Low-voltage electrical and electronic equipment up to 10 kV Kompatybilność elektromagnetyczna - odporność na wysokoenergetyczne udary typu surge (1,2/50 - 8/20) μs
in the range (0,2 - 8,4) kV
PN-EN 61000-4-5:2014-10 | PN-EN 61000-4-5:2014-10/A1:2018-01
6 Electrical and mechanical equipment and subassemblies with maximum dimensions 1500x1600x2000mm Resistance and endurance to cold – test A PN-EN 60068-2-1:2009
7 Electrical and mechanical equipment and subassemblies with maximum dimensions 1500x1600x2000mm Resistance and endurance to dry heat – test B PN-EN 60068-2-2:2009
8 Electrical and mechanical equipment and subassemblies with maximum dimensions 1500x1600x2000mm Resistance and endurance to cyclic damp heat – test Db PN-EN 60068-2-30:2008 z wył. p. 7.3.3, wariant I
9 Electrical and mechanical equipment and subassemblies with maximum dimensions 1500x1600x2000mm Resistance and endurance to steady-state damp heat – test Cab PN-EN 60068-2-78:2013-11
10 Electrical and mechanical equipment and subassemblies with maximum dimensions 1500x1600x2000mm Odporność i wytrzymałość na zmiany temperatury
Tempo zmian do 1 K / min Range od -60 °C do 85 °C
Method: Nb test PN-EN IEC 60068-2-14:2024-04
11 Elementy i urządzenia mechaniczne oraz mechaniczno-elektryczne Force
Range 15 kN, 100 kN
Procedura LB-1.07 wersja 3.01 z 06.06.2024 r.
12 Railway traffic control (srk) equipment of the conventional and high-speed rail system: - station equipment - line block equipment - remote control and railway traffic management equipment - train running supervision equipment - level crossing protection equipment - track and turnout vacancy detection equipment - power supply equipment for srk equipment - CCTV equipment intended for railway traffic operation - railway signal - equipment for setting or checking movable parts of railway turnouts - track – vehicle interaction equipment, except European Train Control System (ETCS) balises - hump yard control equipment, including track brakes - interfaces of the above systems and equipment for connection with the associated equipment intended for installation Parametry funkcjonalne (wg PN-EN 50129:2019-01/AC, rozdz. 7.2 sekcja 2.3) Procedura LB-2.01 wersja 3.04 z 07.05.2026 r. | PN-EN 50129:2019-01/AC
13 Railway traffic control (srk) equipment of the conventional and high-speed rail system: - station equipment - line block equipment - remote control and railway traffic management equipment - train running supervision equipment - level crossing protection equipment - track and turnout vacancy detection equipment - power supply equipment for srk equipment - CCTV equipment intended for railway traffic operation - railway signal - equipment for setting or checking movable parts of railway turnouts - track – vehicle interaction equipment, except European Train Control System (ETCS) balises - hump yard control equipment, including track brakes - interfaces of the above systems and equipment for connection with the associated equipment intended for installation Functional safety parameters (acc. to PN-EN 50129: 2019-01/AC, clause 7.2 sections 3, 4, annex B3) Procedura LB-2.01 wersja 3.04 z 07.05.2026 r. | PN-EN 50129:2019-01/AC
14 Railway traffic control (srk) equipment of the conventional and high-speed rail system: - station equipment - line block equipment - remote control and railway traffic management equipment - train running supervision equipment - level crossing protection equipment - track and turnout vacancy detection equipment - power supply equipment for srk equipment - CCTV equipment intended for railway traffic operation - railway signal - equipment for setting or checking movable parts of railway turnouts - track – vehicle interaction equipment, except European Train Control System (ETCS) balises - hump yard control equipment, including track brakes - interfaces of the above systems and equipment for connection with the associated equipment intended for installation Integralność oprogramowania i sprzętu (wg PN-EN 50716:2024-05 aneks A, tab. A6, poz. 1 i 2) Procedura LB-2.01 wersja 3.04 z 07.05.2026 r. | PN-EN 50716:2024-05
15 Railway traffic control (srk) equipment of the conventional and high-speed rail system: - station equipment - line block equipment - remote control and railway traffic management equipment - train running supervision equipment - level crossing protection equipment - track and turnout vacancy detection equipment - power supply equipment for srk equipment - CCTV equipment intended for railway traffic operation - railway signal - equipment for setting or checking movable parts of railway turnouts - track – vehicle interaction equipment, except European Train Control System (ETCS) balises - hump yard control equipment, including track brakes - interfaces of the above systems and equipment for connection with the associated equipment intended for installation System response to failures during performance of a function or during standby (acc. to PN-EN 50129: 2019-01/AC, Annex E, Table E5, items 5-8) Procedura LB-2.01 wersja 3.04 z 07.05.2026 r. | PN-EN 50129:2019-01/AC
16 Railway traffic control (srk) equipment of the conventional and high-speed rail system: - station equipment - line block equipment - remote control and railway traffic management equipment - train running supervision equipment - level crossing protection equipment - track and turnout vacancy detection equipment - power supply equipment for srk equipment - CCTV equipment intended for railway traffic operation - railway signal - equipment for setting or checking movable parts of railway turnouts - track – vehicle interaction equipment, except European Train Control System (ETCS) balises - hump yard control equipment, including track brakes - interfaces of the above systems and equipment for connection with the associated equipment intended for installation Reakcja systemu na błędy systematyczne podczas wykonywania określonej funkcji lub czuwania (wg PN-EN 50129:2019-01/AC, aneks E, tab. E5, poz. 1) Procedura LB-2.01 wersja 3.04 z 07.05.2026 r. | PN-EN 50129:2019-01/AC
17 Railway traffic control (srk) equipment of the conventional and high-speed rail system: - station equipment - line block equipment - remote control and railway traffic management equipment - train running control equipment - traffic safety equipment at level crossings - track and turnout vacancy detection equipment - power supply equipment for railway traffic control devices - closed-circuit television equipment intended for railway traffic operation - railway signal - equipment for setting or checking movable elements of a railway turnout - track – vehicle interaction equipment, except balises of the European Train Control System (ETCS) - shunting control equipment, including track brakes Testy kwalifikacyjne bezpieczeństwa funkcjonowania w warunkach eksploatacji (wg PN-EN 50129:2019-01/AC, rozdz. 5.3.12 oraz 7.2 sekcja 6) ze sprawdzeniem zgodności parametrów RAMS (zał. B normy PN-EN 50126-1:2018-01) Procedura LB-2.03 wersja 3.01 z 06.06.2024 r. | PN-EN 50129:2019-01/AC | EN 50126-1:2018-01

Reference standards (17)

EN 50126-1:2018-01
PN-EN 50129:2019-01/AC
PN-EN 50716:2024-05
PN-EN 60068-2-1:2009
PN-EN 60068-2-2:2009
PN-EN 60068-2-30:2008 z wył. p. 7.3.3, wariant I
PN-EN 60068-2-78:2013-11
PN-EN 61000-4-2:2026-03
PN-EN 61000-4-4:2013-05
PN-EN 61000-4-5:2014-10
PN-EN 61000-4-5:2014-10/A1:2018-01
PN-EN 61180:2016-12
PN-EN IEC 60068-2-14:2024-04
Procedura LB-1.01 wersja 3.00 z 22.07.2021 r.
Procedura LB-1.07 wersja 3.01 z 06.06.2024 r.
Procedura LB-2.01 wersja 3.04 z 07.05.2026 r.
Procedura LB-2.03 wersja 3.01 z 06.06.2024 r.

The same scope as data (JSON): https://labcoda.pl/api/accreditation-scopes/labs/PL/AB%20516