🇵🇱 INSTYTUT BADAŃ INŻYNIERSKICH PL

PCA AB 1570 • Poczesna, Poland • 20 methods

Construction

INSTYTUT BADAŃ INŻYNIERSKICH is a laboratory accredited by PCA under number AB 1570 (Poczesna, Poland). Its accreditation scope covers 20 test methods in the following areas: Construction. Test objects include: Road pavements, Bituminous mixtures, Aggregates, Asphalt pavements and asphalt mixtures. Most frequently used techniques: Leutner method, Method: A, Method: B.

At a glance

  • Accreditation number: PCA AB 1570
  • Methods in scope: 20
  • Types of test objects: 7
  • Techniques used: 5
  • City: Poczesna, Poland
Accreditation number
AB 1570
Accreditation body
PCA
Address
LABOR AQUILA Paweł Słaboński, Nowa Wieś, ul. Działkowa 15, 42-262 Poczesna
City
Poczesna, Poland

What this laboratory tests (7)

Analytical techniques used (5)

Accreditation scope — test methods (20)

No. Test object Methodology / Parameters Technique Reference document
Test methods
1 Bituminous mixtures Soluble binder content
Range (2 - 7) %
PN-EN 12697-1:2020-08 p.B.1.2, p.B.1.7 i zał. D
2 Bituminous mixtures Density in water
Range (2,100 - 3,000) Mg/m3
Method: A PN-EN 12697-5:2019-01
3 Bituminous mixtures Bulk density
Range (2,100÷3,000) Mg/m3
Method: B PN-EN 12697-6:2020-07
4 Bituminous mixtures Grading
Range (0 - 1,5) mm
PN-EN 12697-2+A1:2019-12 | PN-EN 12697-2:2025-06 | PN-EN 933-1:2012
5 Bituminous mixtures Air void content (calculated) PN-EN 12697-8:2019-01 p.4
6 Bituminous mixtures Sampling PN-EN 12697-27:2017-07 p. 4.1, 4.3, 4.7
7 Aggregates Particle size distribution
Range (0 - 63) mm
PN-EN 933-1:2012
8 Aggregates Sampling PN-EN 932-1:1999 p.8.8
9 Concrete Compressive strength
Force range (100 - 2000) kN
PN-EN 12390-3:2019-07 | PN-EN 12504-1:2019-08
10 Fresh concrete Sampling PN-EN 12350-1:2019-07
11 Road pavements Thickness of bituminous pavement based on cores
Range do 500 mm
PN-EN 12697-36:2022-09, pkt. 6.1
12 Road pavements Compaction index of asphalt layers (calculated) PN-EN 13108-20: 2008 zał. C4 | PN-EN 13108-20:2016-07 zał. C4
13 Road pavements Air void content in the layer (calculated) PN-EN 12697-8:2019-01 p.4
14 Road pavements Longitudinal profiles (evenness)
International Roughness Index IRI (calculated)
Profilometric method - laser profilograph PN-EN 13036-6:2008 | Rozporządzenie Ministra Infrastruktury z dnia 01.08.2019 r. (Dz.U. 2019 poz.1643 z dn.29.08.2019)
15 Road pavements Interlayer bond strength
Range (0 – 50)
Leutner method Instrukcja laboratoryjnego badania sczepności międzywarstwowej warstw asfaltowych wg metody Leutnera i wymagania techniczne sczepności, wyd. Politechnika Gdańska, 31.08.2014 r.
16 Road pavements Sampling PN-EN 12697-27:2017-07 p. 4.7 | PN-EN 12504-1:2019-08
17 Road pavements Measurement of pavement deflections with an FWD device
Range do 2000 μm
PT-7.2-1 wyd.1 z dn. 27.10.2023 r.
18 Road pavements Thickness of concrete pavement based on cores
Range do 500 mm
PN-EN 13863-3:2007
19 Asphalt pavements and asphalt mixtures Determination of resistance to permanent deformation
Range (0 - 20) mm
Method: wheel tracking by method B (in air), small device PN-EN 12697-22+A1:2024-05
20 Reclaimed asphalt Sampling PN-EN 932-1:1999 p.8.8

Reference standards (22)

Instrukcja laboratoryjnego badania sczepności międzywarstwowej warstw asfaltowych wg metody Leutnera i wymagania techniczne sczepności, wyd. Politechnika Gdańska, 31.08.2014 r.
PN-EN 12350-1:2019-07
PN-EN 12390-3:2019-07
PN-EN 12504-1:2019-08
PN-EN 12697-1:2020-08 p.B.1.2, p.B.1.7 i zał. D
PN-EN 12697-2+A1:2019-12
PN-EN 12697-22+A1:2024-05
PN-EN 12697-27:2017-07 p. 4.1, 4.3, 4.7
PN-EN 12697-27:2017-07 p. 4.7
PN-EN 12697-2:2025-06
PN-EN 12697-36:2022-09, pkt. 6.1
PN-EN 12697-5:2019-01
PN-EN 12697-6:2020-07
PN-EN 12697-8:2019-01 p.4
PN-EN 13036-6:2008
PN-EN 13108-20: 2008 zał. C4
PN-EN 13108-20:2016-07 zał. C4
PN-EN 13863-3:2007
PN-EN 932-1:1999 p.8.8
PN-EN 933-1:2012
PT-7.2-1 wyd.1 z dn. 27.10.2023 r.
Rozporządzenie Ministra Infrastruktury z dnia 01.08.2019 r. (Dz.U. 2019 poz.1643 z dn.29.08.2019)