💡 Luminaires for road and street lighting: particular requirements — tunnel and column-integrated luminaires, protection against moisture IPX3/IPX5, static wind-load test, glass covers (shatter test, particle count); PN-EN 60598-2-3

Electronics and EMC PN-EN 60598-2-3

In short

Particular requirements for luminaires for road, street and other public outdoor lighting, for tunnel lighting and for column-integrated luminaires with a height of at least 2,5 m, on supply voltages not exceeding 1000 V. The test is performed according to PN-EN 60598-2-3:2006 (Polish version; implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT]) with amendment PN-EN 60598-2-3:2006/A1:2012 (Polish version; implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]); STATUS (as of 19.11.2026): PKN cards: PN-EN 60598-2-3:2006 “Oprawy oświetleniowe -- Część 2-3: Wymagania szczegółowe -- Oprawy oświetleniowe drogowe i uliczne” — Polish version (published 17-05-2006, 18 pages), KT 4 Lighting Technology, implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT], replaces PN-EN 60598-2-3:2003 and PN-EN 60598-2-3:2003/AC:2006 (English versions); amendment PN-EN 60598-2-3:2006/A1:2012 — Polish version (published 19-12-2012, 7 pages), implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]; the cards give no withdrawal date. The PKN search for “PN-EN 60598-2-3” and “PN-EN IEC 60598-2-3” returns no newer edition. The procedure comprises 4 steps; it is used for: Luminaires for road, street and other public outdoor lighting mounted on a bracket, mast arm or post top, on wires or on a wall (3.1, 3.4), Tunnel lighting luminaires mounted to the walls or ceiling of the tunnel (3.3.11, 3.6.1), Column-integrated luminaires with a total height of at least 2,5 m (3.1, amendment 1).

At a glance

  • Standard: PN-EN 60598-2-3:2006 (Polish version; implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT]) with amendment PN-EN 60598-2-3:2006/A1:2012 (Polish version; implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT])
  • Category: Electronics and EMC
  • Procedure steps: 4
  • STATUS (as of 19.11.2026): PKN cards: PN-EN 60598-2-3:2006 “Oprawy oświetleniowe -- Część 2-3: Wymagania szczegółowe -- Oprawy oświetleniowe drogowe i uliczne” — Polish version (published 17-05-2006, 18 pages), KT 4 Lighting Technology, implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT], replaces PN-EN 60598-2-3:2003 and PN-EN 60598-2-3:2003/AC:2006 (English versions); amendment PN-EN 60598-2-3:2006/A1:2012 — Polish version (published 19-12-2012, 7 pages), implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]; the cards give no withdrawal date. The PKN search for “PN-EN 60598-2-3” and “PN-EN IEC 60598-2-3” returns no newer edition.
  • Scope (3.1): road, street and public outdoor lighting; tunnels; column-integrated luminaires ≥ 2,5 m; supply voltage ≤ 1000 V
  • Protection against moisture (3.6.1): at least IPX3; tunnel luminaires and glazing with an open-sided external part — IPX5; column-integrated luminaires: below 2,5 m IP3X, above 2,5 m IP2X

Overview

WHAT THE STANDARD COVERS. According to clause 3.1 of IEC 60598-2-3 (edition 3.1: the third edition of 2002 with amendment 1 of 2011) the standard specifies requirements for luminaires for road, street and other public outdoor lighting, for tunnel lighting and for column-integrated luminaires with a minimum total height above normal ground level of 2,5 m, for use with electrical lighting sources on supply voltages not exceeding 1000 V. It is read together with IEC 60598-1; the tests of the relevant sections of Part 1 are carried out in the order listed in this section. Because of the dimensions of the sample, only the appropriate parts of the luminaire may be tested (mainly column-integrated luminaires).

ACCORDING TO THE TEXT OF IEC 60598-2-3:2002+AMD1:2011 CSV (publisher's sample: foreword, clauses 3.1–3.6.5.2). The standard was prepared by IEC subcommittee SC 34D (luminaires) of IEC TC 34. Amendment 1 introduced requirements for column-integrated luminaires. Additional references: IEC 60068-2-75 (hammer tests Eh), IEC 60364-7-714 (external lighting installations) and IEC 62262 (IK code). Definitions include the span wire (between main supports, carries the weight of the complete installation), suspension wire, stay wire, column-integrated luminaire, lighting column and tunnel luminaires. Typical modes of installation: on a pipe (bracket), on a mast arm, on a post top, on span or suspension wires and on a wall.

MARKING AND INSTRUCTIONS (3.5). In addition to Section 3 of IEC 60598-1, the instruction leaflet gives, among others: the design attitude, the weight including control gear, the overall dimensions, for mounting more than 8 m above ground the maximum projected area subjected to wind force, the range of suspension-wire cross-sections, the dimensions of the connection-box compartment, the torque setting of fixing bolts (N·m) and the maximum mounting height relevant to the selected method of protection against falling glass particles.

CONSTRUCTION (3.6). Protection against ingress of moisture of at least IPX3; tunnel luminaires and the glazing of column-integrated luminaires with an open-sided external part — IPX5. Column-integrated luminaires: parts below 2,5 m — IP3X, above 2,5 m — IP2X. The attachment shall withstand a wind speed of 150 km/h on the projected surface of the assembly without undue deflection (3.6.3). Static load test (3.6.3.1) for mast-arm and post-top luminaires: the most critical surface (highest Cd × S; without a measured Cd the value 1,2 is taken, measurement — Annex A) is loaded with a constant, evenly distributed load for 10 min; F = ½ ρ × S × Cd × V² (ρ = 1,225 kg/m³), V = 45 m/s (163 km/h) up to 8 m, 52 m/s (188 km/h) between 8 m and 15 m, 57 m/s (205 km/h) above 15 m. After the test: no visible failure, permanent deformation not exceeding a slope of 2 cm/m, no rotation around the point of attachment; the test does not apply to tunnel luminaires.

GLASS COVERS (3.6.5 as worded by amendment 1). Below 5 m there are no additional requirements; above 5 m the cover shall be of glass that fractures into small pieces, of glass with high impact resistance, or protected against scattering of fragments (guard, film); tunnel luminaires always according to 3.6.5.1. Test 3.6.5.1: flat glass supported over its whole area is shattered with a centre punch 30 mm from the mid-point of a longer edge towards the centre (formed glass — supported, e.g. by sand, layer over 30 mm, covered with adhesive film, shattered in the middle); within 5 min the particles are counted in a 50 mm square in the area of coarsest fracture — pass with more than 40 particles, every particle dimension less than 50 mm. The 2002 base version (replaced by amendment 1) required more than 60 particles. Test 3.6.5.2 (high impact resistant glass) starts with preconditioning by the thermal endurance test of 12.3 of IEC 60598-1; its further course is outside the sample.

CONTENT (table of contents). Further: creepage distances and clearances, earthing, terminals, wiring, protection against electric shock, endurance and thermal tests, resistance to dust and moisture, insulation resistance and electric strength, resistance to heat, fire and tracking; Annex A — drag coefficient measurement, Annex B — amended clauses requiring retesting. The sample ends at 3.6.5.2.1.

STATUS (as of 19.11.2026). PKN cards: PN-EN 60598-2-3:2006 “Oprawy oświetleniowe -- Część 2-3: Wymagania szczegółowe -- Oprawy oświetleniowe drogowe i uliczne” — Polish version (published 17-05-2006, 18 pages), KT 4 Lighting Technology, implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT], replaces PN-EN 60598-2-3:2003 and PN-EN 60598-2-3:2003/AC:2006 (English versions); amendment PN-EN 60598-2-3:2006/A1:2012 — Polish version (published 19-12-2012, 7 pages), implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]; the cards give no withdrawal date. The PKN search for “PN-EN 60598-2-3” and “PN-EN IEC 60598-2-3” returns no newer edition.

Method principle

The luminaire is tested according to IEC 60598-1 in the order of the sections of Part 1, with the additional requirements of Part 2-3: protection against moisture (at least IPX3), static loading of the most critical surface with a force corresponding to the wind speed for the mounting height (45, 52 or 57 m/s) for 10 min and — for mounting above 5 m — verification of the protection against falling glass particles (shatter test and particle count in a 50 mm square).

Applications

Key parameters

ParameterValue
STATUS (as of 19.11.2026)PKN cards: PN-EN 60598-2-3:2006 “Oprawy oświetleniowe -- Część 2-3: Wymagania szczegółowe -- Oprawy oświetleniowe drogowe i uliczne” — Polish version (published 17-05-2006, 18 pages), KT 4 Lighting Technology, implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT], replaces PN-EN 60598-2-3:2003 and PN-EN 60598-2-3:2003/AC:2006 (English versions); amendment PN-EN 60598-2-3:2006/A1:2012 — Polish version (published 19-12-2012, 7 pages), implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]; the cards give no withdrawal date. The PKN search for “PN-EN 60598-2-3” and “PN-EN IEC 60598-2-3” returns no newer edition.
Scope (3.1)road, street and public outdoor lighting; tunnels; column-integrated luminaires ≥ 2,5 m; supply voltage ≤ 1000 V
Protection against moisture (3.6.1)at least IPX3; tunnel luminaires and glazing with an open-sided external part — IPX5; column-integrated luminaires: below 2,5 m IP3X, above 2,5 m IP2X
Wind speed in the static test (3.6.3.1)45 m/s (163 km/h) up to 8 m; 52 m/s (188 km/h) from 8 m to 15 m; 57 m/s (205 km/h) above 15 m
Load (3.6.3.1)F = ½ ρ × S × Cd × V², ρ = 1,225 kg/m³, Cd = 1,2 without measurement (Annex A); 10 min; permanent deformation ≤ 2 cm/m
Glass covers (3.6.5, amendment 1)mounting above 5 m: glass fracturing into small pieces, high impact resistant glass or retention of fragments
Shatter test (3.6.5.1)centre punch 30 mm from the mid-point of a longer edge; count within 5 min in a 50 mm square; more than 40 particles, each < 50 mm

Standard

Standard number
PN-EN 60598-2-3:2006 (Polish version; implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT]) with amendment PN-EN 60598-2-3:2006/A1:2012 (Polish version; implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT])
Title (PL)
Oprawy oświetleniowe — Część 2-3: Wymagania szczegółowe — Oprawy oświetleniowe drogowe i uliczne
Title (EN)
Luminaires — Part 2-3: Particular requirements — Luminaires for road and street lighting

Step-by-step procedure

  1. Tests according to IEC 60598-1

    Tests of the sections of Part 1 in the order of this section; appropriate parts of the luminaire may be tested (3.2).

  2. Marking and instructions

    Check of the information of 3.5: design attitude, weight, dimensions, area exposed to wind (mounting > 8 m), torque setting, maximum mounting height.

  3. Static wind-load test

    Determination of the most critical surface (Cd × S), loading with force F for 10 min, assessment: no failure, deformation ≤ 2 cm/m, no rotation (3.6.3.1).

  4. Glass covers

    For mounting above 5 m: check of the declared method of protection; for glass fracturing into small pieces, shatter test and particle count in a 50 mm square (3.6.5.1).

Required equipment and apparatus

EquipmentExampleIndicative price
Static load test rig (3.6.3.1, Figure 1)Evenly distributed load on the most critical surface, e.g. bags filled with sand, lead shot or small balls—
Centre punch (3.6.5.1, note 1)Steel tool with a sharp point for shattering the glass cover—
Transparent 50 mm square (3.6.5.1, note 2)Placed over the glass to count particles, each counted particle is marked with ink—

Frequently asked questions

Which standard describes this test?

The test is performed according to PN-EN 60598-2-3:2006 (Polish version; implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT]) with amendment PN-EN 60598-2-3:2006/A1:2012 (Polish version; implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]) — “Luminaires — Part 2-3: Particular requirements — Luminaires for road and street lighting”.

How does this method work?

The luminaire is tested according to IEC 60598-1 in the order of the sections of Part 1, with the additional requirements of Part 2-3: protection against moisture (at least IPX3), static loading of the most critical surface with a force corresponding to the wind speed for the mounting height (45, 52 or 57 m/s) for 10 min and — for mounting above 5 m — verification of the protection against falling glass particles (shatter test and particle count in a 50 mm square).

What is the measuring range and accuracy?

STATUS (as of 19.11.2026): PKN cards: PN-EN 60598-2-3:2006 “Oprawy oświetleniowe -- Część 2-3: Wymagania szczegółowe -- Oprawy oświetleniowe drogowe i uliczne” — Polish version (published 17-05-2006, 18 pages), KT 4 Lighting Technology, implements EN 60598-2-3:2003, EN 60598-2-3:2003/corrigendum Aug. 2005 and IEC 60598-2-3:2002 [IDT], replaces PN-EN 60598-2-3:2003 and PN-EN 60598-2-3:2003/AC:2006 (English versions); amendment PN-EN 60598-2-3:2006/A1:2012 — Polish version (published 19-12-2012, 7 pages), implements EN 60598-2-3:2003/A1:2011 and IEC 60598-2-3:2002/AMD1:2011 [IDT]; the cards give no withdrawal date. The PKN search for “PN-EN 60598-2-3” and “PN-EN IEC 60598-2-3” returns no newer edition.; Scope (3.1): road, street and public outdoor lighting; tunnels; column-integrated luminaires ≥ 2,5 m; supply voltage ≤ 1000 V; Protection against moisture (3.6.1): at least IPX3; tunnel luminaires and glazing with an open-sided external part — IPX5; column-integrated luminaires: below 2,5 m IP3X, above 2,5 m IP2X; Wind speed in the static test (3.6.3.1): 45 m/s (163 km/h) up to 8 m; 52 m/s (188 km/h) from 8 m to 15 m; 57 m/s (205 km/h) above 15 m.

How long does the test take?

The procedure comprises 4 steps. The standard does not give a duration for every stage — the laboratory's own procedure decides.

What equipment is required?

Static load test rig (3.6.3.1, Figure 1), Centre punch (3.6.5.1, note 1), Transparent 50 mm square (3.6.5.1, note 2).

Where is this test used?

Luminaires for road, street and other public outdoor lighting mounted on a bracket, mast arm or post top, on wires or on a wall (3.1, 3.4); Tunnel lighting luminaires mounted to the walls or ceiling of the tunnel (3.3.11, 3.6.1); Column-integrated luminaires with a total height of at least 2,5 m (3.1, amendment 1); Static wind-load test of the attachment of mast-arm and post-top luminaires and external parts (3.6.3.1); Testing of glass covers of luminaires mounted above 5 m — shatter test and particle count (3.6.5.1).

Which laboratory can perform this test?

The test is performed by laboratories accredited to ISO/IEC 17025. On LabCoda you can find them by the standard number PN-EN 60598-2-3.

🔍 Find a laboratory performing this test